Europe Data Center Construction Market Size, Segment and Growth by Forecast Period: (2021-2031)

Comments · 243 Views

A Tier 4 data center is the highest certification in the Uptime Institute's system of segmenting data center performance into four tiers. This tier accounts for an expected uptime of 99.995% per year.

Europe Data Center Construction Market Outlook

The Europe data center construction market was valued at US$ 54,813.00 million in 2022 and is projected to reach US$ 96,516.99 million by 2030, growing at a CAGR of 7.3% from 2022 to 2030.

?Download Full PDF Sample Copy of Market Report @
https://www.businessmarketinsights.com/sample/BMIRE00029916

Growing Demand for Tier 4 Data Centers Fuels Market Growth

The increasing construction of Tier 4 data centers is a key driver of market expansion in Europe. Representing the highest certification level by the Uptime Institute, Tier 4 data centers are designed for 99.995% uptime, offering full fault tolerance and redundancy. These centers are particularly critical for sectors such as finance, healthcare, and telecommunications, where uninterrupted operations are essential.

The demand for such high-reliability facilities is growing in tandem with the digital transformation of industries. As a result, the construction of Tier 4 facilities is accelerating across Europe, offering premium pricing potential due to their complex infrastructure and operational rigor. This trend not only attracts substantial investment but also provides strong profit margins for both data center operators and construction companies.

Building Tier 4 data centers requires expertise in electrical and mechanical engineering, high-grade construction materials, and specialized IT infrastructure. This fuels growth across supporting industries and creates new employment opportunities. Notably, companies like EBRC and Sunbird Inc. operate several Tier 4 facilities, such as Resilience Centre West, CTRLS Datacenters Ltd., Resilience Centre South, Kayl, European Reliance Centre East, and others in key locations like Windhof and Betzdorf.

Market Dynamics and Regional Developments

The overall growth of the Europe data center construction market is underpinned by factors such as:

  • A robust regional economy
  • Rising demand for cloud computing services
  • Greater dependence on digital technologies across sectors

The market includes a broad range of infrastructure components and service offerings, such as electrical, mechanical, and general infrastructure, as well as solutions and professional services.

Several high-profile projects are contributing to market momentum. For instance:

  • In October 2023, Data4, a France-based data center operator, appointed Hill International to manage the construction of its MAD2 campus in San Agustín de Guadalix, Spain. The project spans 6.5 hectares and will house four data centers with a total capacity of 80 MW.
  • Also in October 2023, Telehouse, a global colocation services provider, began building a second data center at its TH3 Paris Magny site in France. The new facility will offer 12,000 square meters of IT floor space and 18 MW of power capacity. This expansion is part of Telehouse's strategic goal to boost European and national digital sovereignty and attract global internet traffic to the region.

These developments, combined with increasing investment in digital infrastructure, are expected to significantly drive the growth of the Europe data center construction market through 2030.

Europe Data Center Construction Strategic Insights

Strategic insights for the Europe Data Center Construction provides data-driven analysis of the industry landscape, including current trends, key players, and regional nuances. These insights offer actionable recommendations, enabling readers to differentiate themselves from competitors by identifying untapped segments or developing unique value propositions. Leveraging data analytics, these insights help industry players anticipate the market shifts, whether investors, manufacturers, or other stakeholders. A future-oriented perspective is essential, helping stakeholders anticipate market shifts and position themselves for long-term success in this dynamic region. Ultimately, effective strategic insights empower readers to make informed decisions that drive profitability and achieve their business objectives within the market.

Market leaders and key company profiles

  Rittal GmbH & co KG

  Schneider Electric SE

  DPR Construction Inc

  Mercury Engineering Ltd

  STO Building Group Inc

  AECOM

  Turner Construction Co

  Eaton Corp Plc

Regional Insights: Europe Data Center Construction Market
The geographic scope of the Europe data center construction market encompasses the distinct regions where companies operate and compete. Recognizing regional differences—such as unique consumer needs (e.g., preferred plug types or battery backup expectations), economic variations, and differing regulatory frameworks—is essential for developing market-specific strategies. By identifying underserved regions and customizing offerings to local requirements, businesses can enhance their market presence. A well-defined regional focus enables more efficient resource allocation, sharper marketing efforts, and stronger positioning against local competitors, ultimately fostering growth in strategically targeted areas.

Europe Data Center Construction Market – Segmentation Overview

The Europe data center construction market is segmented by construction type, tier standards, industry verticals, and geography.

By Construction Type:

  • The market is divided into general construction, electrical design, and mechanical design.
  • Among these, the electrical design segment accounted for the largest market share in 2022, driven by the increasing demand for reliable power infrastructure in data centers.

By Tier Standards:

  • The market is segmented into Tier 1 & Tier 2, Tier 3, and Tier 4 data centers.
  • Tier 3 data centers held the dominant share in 2022, reflecting the rising preference for a balance between performance, reliability, and cost-efficiency.

By Industry Vertical:

  • Key verticals include IT & telecommunications, banking, financial services and insurance (BFSI), government, education, manufacturing, retail, transportation, media & entertainment, and others.
  • The IT & telecommunications sector led the market in 2022, owing to the continued expansion of digital services and cloud infrastructure.

By Country:

  • The regional breakdown includes Germany, France, UK, Sweden, and the Rest of Europe.
  • The Rest of Europe emerged as the leading contributor to the market in 2022, reflecting widespread data center investments across emerging and developed European countries outside the major four.

Key Players:
Prominent companies operating in the Europe data center construction market include:

  • Rittal GmbH & Co. KG
  • Schneider Electric SE
  • DPR Construction Inc.
  • Mercury Engineering Ltd.
  • STO Building Group Inc.
  • AECOM
  • Turner Construction Co.
  • Eaton Corporation Plc

These players are actively contributing to the market through technological innovation, strategic partnerships, and robust construction capabilities.

About Us:
Business Market Insights is a market research platform that provides subscription service for industry and company reports. Our research team has extensive professional expertise in domains such as Electronics & Semiconductor; Aerospace & Défense; Automotive & Transportation; Energy & Power; Healthcare; Manufacturing & Construction; Food & Beverages; Chemicals & Materials; and Technology, Media, & Telecommunications